Standard

ISO/ASTM TS 52949:2025

Published

Corrigendums and amendments are bought separately.

Language
Services

Abstract

This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document. This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal. Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.

Document information

  • Standard from ISO/ASTM
  • Published:
  • Edition: 1
  • Document type: TS
  • Pages
  • Publisher ISO/ASTM
  • Distributor ISO/ASTM
  • ICS 25.030
  • ISO TC ISO/TC 261

Product Relations

  • Joinded work item: ASTM F42