Standard

CLC/TS 50539-12

Withdrawn

Corrigendums and amendments are bought separately.

Language
Services

Abstract

This Technical Specification describes the principles for selection, location, coordination and operation of SPDs to be connected to PV installations. The d.c. side is rated up to 1 500 V d.c. and the a.c. side, if any, is rated up to 1 000 V rms 50 Hz. The electrical installation starts from a PV generator or a set of interconnected PV modules with their cables, provided by the PV generator manufacturer, up to the user installation or the utility supply point. For PV installations including batteries, additional requirements will be necessary. NOTE 1 HD 60364-7-712, CLC/TS 61643-12 and EN 62305-4 are also applicable. NOTE 2 This Technical Specification deals only with SPDs, and not with SPDs components integrated inside equipment.

Document information

  • Standard from SFS-sähkö
  • Published:
  • Edition: 1
  • Document type: IS
  • Pages
  • Publisher SFS
  • Distributor SFS-sähkö
  • Technical Committee CLC/TC 37A

Product Relations